Friday, 13 December 2024

Scenery in the Ravine Part 2

Somehow I missed taking some progress shots on this module. But here is where it's landed for now. I completed the static grassing and added many of the conifer trees from the old layout. I also added a couple of my redwood trees on the edge of the module as the next module to be built will introduce the redwood forest. 

The river is to have gravel and water added, and I plan to add some light foliage to the nooks and crannies on the gorge cliffs. Of course, the steel viaduct is still to be completed, but for now, the plywood bridge has been painted brown as a stand-in.  



Sunday, 8 December 2024

Stone Roundhouse Scratchbuild Part 6

 

This may be the last update for the roundhouse for a while, I'm pretty happy with where it ended up. 

I added some wooden flooring, scribed and weathered balsa. In time I'll rafters, framing and vertical roof supports and I hope to detail the interior. But for now, it's ok. I scratchbuilt doors using pre-scribed balsa sheet and added framing using cardstock. I made a card template and mass-produced these over several evenings. For now, they are just glued in place.

I also took a photo of the exterior of the roundhouse and duplicated it in Photoshop to make a continuous print that could be used as a stand-in for a back wall. Again, it is not a final solution, but more like a temporary stage prop to help the illusion. 

Lastly,  a temporary roof was made with cardstock and copier paper layered on to represent tar paper. 

The layout is being prepared for its ultimate test, being able to move. I'm very pleased to have the roundhouse project to this point prior to moving as it feels like a natural stopping point for this module.